本帖最后由 roy 于 2013-7-1 02:48 编辑

5DAY-PROJECT

-----------------------------------------------------

Client:HunanTV

Production time: 5 day (3D:4day Comp:2.5day)

Executive producer: Roy(

新浪

微博:@Roy丶design

Art direction: Roy / Kaka(Ending&Logo /

新浪

微博

@卡玛布丁

)

3D animation / Shader : Sean (1-22) / WangQ (22-28 / 新浪

微博

@_________靠近阳光

)

VFX: Roy / Sean

新浪

微博:@Roy丶design

Compositor: Roy

新浪

微博:@Roy丶design

Music: DF_lee(

新浪

微博

@DF_Lee

------------------------------------

The project was too tired, it only took five days or so, including creativity, structure, model animation, fluid effects, compositing, and music. A lot of regret, a long time can do better. Time because it is too tight, the middle of a lens with reference to Russia N3 design (behance.net/gallery/Cordiant-Summer13-Stage-1-WIP/8065503) this work.

-----------------

{:soso_e105:}

部分作品展示BE(个别地区需翻墙):http://www.behance.net/Chinaroy

联系方式QQ:316850254

weibo:http://weibo.com/roydesign

email:tjclsy@vip.qq.com

土豆可选原画(视频质量不高,见谅)